For our Client we have prepared the design of installation for collection of the draff with partial modernization of existing system.
The Project includes:
- 2 silos – 200 tons each (5m diameter, 12m height)
- 3 screw conveyors
- Pneumatic transport installation
- Electrical connection, automatics and control
- Installation start-up